Stannard Street Townhouses

Project No: 6633

The Stannard St project consisted of 18 townhouses built on a single suspended ‘floor’ over a floodplain. The suspended ground floor extends over most of the lot, forming a new ‘ground level’ upon which the townhouses are built.  A previous structural engineer had provided a design that was shown to be inadequate for the required loads, particularly in the driveway crossover which was only designed to carry light vehicles and would not allow commercial vehicles such as removalist trucks access.

A couple of the townhouses had been partly constructed, these had since showed water damage, and our investigation found that fire rating walls had been installed incorrectly. 

BE Collective was able to comprehensively identify these issues, and respond with cost and quality conscious solutions across the board, also managing to improve the constructability and estimated lifespan of the project.

Consequently BE Collective were commissioned to provide design and documentation services for the proposed changes and revisions.

Share this post:

Facebook
Twitter
LinkedIn

Gold Coast Aquatic Centre

An extensive upgrade of the existing Southport Aquatic Centre for the 2016 Commonwealth Games. Large podium post-tensioned slabs up to 110m long supporting extensive temporary

Read More »

Spring Street, Bondi

Located in Bondi Junction, this residential building features 11 stories of stepped unit development with transfer floor & post-tensioned floors.

Read More »

The Palisades, Bondi

A 34 unit ten-story residential building located in Bondi Junction, with two basement levels involving a complex shoring system in the sand.

Read More »

Oakford, Darling Harbour

A 20 story serviced apartment building in beautiful Darling Harbour, this project saw three major transfer floors won in Design & Construct tender with Builder.

Read More »