Kedron Park Rd – Dental Clinic

Project No: 7026

For our Kedron Park Rd project we has the pleasure to again work alongside Fairweather Architecture as we assisted on the extension of the North Brisbane Dental Clinic.  In support of the extension we provided a range of multi-discipline services.  This included Structural Design & Documentation and design certification as necessary; Civil Design & Documentation and Civil Op Works in support of Brisbane City Council (BCC) application; and Hydraulic Plumbing & Drainage and support of BCC application. We also provided section J Energy Efficiency assessment, which included preliminary design assessment; detailed Deemed-to-Satisfy energy efficiency reporting with reference to NCC; and form 15 energy efficiency certification. 

A key challenge for the project was ensuring the the post development stormwater discharge did not exceed pre-development levels, for which we provided a preliminary feasibility study, recommendations, and full design & documentation. 

Share this post:

Facebook
Twitter
LinkedIn

Gold Coast Aquatic Centre

An extensive upgrade of the existing Southport Aquatic Centre for the 2016 Commonwealth Games. Large podium post-tensioned slabs up to 110m long supporting extensive temporary

Read More »

Tetra Pak Office

Purpose-built head office for Tetra Pak located at 1B Hill Road, Homebush. It also includes suspended concrete floors & a warehouse.

Read More »

Ford Product Development

A large testing & development facility with multiple overhead cranes, monorails underslung cranes, blast-proof engine testing facility & office 112,000m2 workshop & 3,600m2 offices.

Read More »

Sony Music

This is a large span steel structure with suspended office & large plant room area for Sony Australia’s first CD & DVD manufacturing plant, 2

Read More »