BE Collective were commissioned to provide structural, civil and hydraulic services for this townhouse development in Murrumba Downs.
The project was comprised of three development stages. The first was a boundary realignment, the second included the subdivision of the site into 3 lots. In addition to a new road reserve which will extend an existing roadway through the site. The final stage involved the further subdivision of the site to make a total of 5 lots.
In order to obtain DA approval from council BE Collective designed and documented the necessary engineering services to provide infrastructure to all lots. Additionally, a stormwater management report was prepared to demonstrate that post development flows will not adversely impact neighbouring properties.
Operational works documentation included; Cut & fill plans, allotment retaining, erosion and sentiment control plans and roadway, pavement and crossover design.