Earle Plaza

Project No: 6372

BE was engaged to provide multi discipline engineering for Earle Plaza in Nerang. Our commission included Design and Certification for a new Fascia screen; engineering for transparent and solid roof areas along with their associated requirements; and balustrading. We also provided Hydraulic consultancy services which covered roof water drainage.

The BEC Team undertook a visual inspection of the existing roof structure and a detailed wind analysis of the site. We then delivered detailed foundation design, two different possible screen options, roof member design, tie back detailing to existing roof structure and secondary framing to existing roof as required.

Share this post:

Facebook
Twitter
LinkedIn

Gold Coast Aquatic Centre

An extensive upgrade of the existing Southport Aquatic Centre for the 2016 Commonwealth Games. Large podium post-tensioned slabs up to 110m long supporting extensive temporary

Read More »

Tetra Pak Office

Purpose-built head office for Tetra Pak located at 1B Hill Road, Homebush. It also includes suspended concrete floors & a warehouse.

Read More »

Ford Product Development

A large testing & development facility with multiple overhead cranes, monorails underslung cranes, blast-proof engine testing facility & office 112,000m2 workshop & 3,600m2 offices.

Read More »

Sony Music

This is a large span steel structure with suspended office & large plant room area for Sony Australia’s first CD & DVD manufacturing plant, 2

Read More »

Gold Coast Aquatic Centre

An extensive upgrade of the existing Southport Aquatic Centre for the 2016 Commonwealth Games. Large podium post-tensioned slabs up to 110m long supporting extensive temporary

Read More »