Craigslea High School Canteen

Project No: 7081

BEC’s Craigslea High School project involved the demolition and extension of the existing school canteen alongside BSPN Arcitecture.  The BEC team provided structural design and documentation as well as construction phase support.

Following the demolition of the existing canteen and pavement slab, we undertook an inspection of the exposed roof structure and framing to assess how best to approach design of the extension bracing.  The new school canteen structure required full glazing on all three sides of the extension, which left minimal room for wall bracing.  To work around this, we braced the extension primarily through the rear wall where it met the existing structure and roof.

Share this post:

Facebook
Twitter
LinkedIn

Gold Coast Aquatic Centre

An extensive upgrade of the existing Southport Aquatic Centre for the 2016 Commonwealth Games. Large podium post-tensioned slabs up to 110m long supporting extensive temporary

Read More »

Gold Coast Aquatic Centre

An extensive upgrade of the existing Southport Aquatic Centre for the 2016 Commonwealth Games. Large podium post-tensioned slabs up to 110m long supporting extensive temporary

Read More »

FiCK Brewing

Project no. 7188 The BE Collective team is excited to have worked on yet another brewery project. Recently featured in The Crafty Pint, our Client,

Read More »